Zhangjiagang RY Electronic CO.,LTD

 

Global Connectivity

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home News

Wiring Harness Assembly Work Instruction

Certifications
Good quality Electrical Wiring Harness for sales
Good quality Electrical Wiring Harness for sales
Customers Reviews
Excellent buyer experience, product arrived within window promised, prodect well-represented/good quality. Will deal with again.

—— Rick Seemann

Les produits sont fabriqués conformément aux règles.Je te commanderai encore!

—— Felix Klee

¡La entrega es rápida!Comunicación eficiente.

—— Chris Broemel

You are one of my best suppliers! with good quality and small MOQ and flexible delivery! Thanks again.

—— Mark Briscoe

매우 전문적인 공급업체와 출하 속도가 빠르고 품질도 좋다

—— Seung Min Lee

Die Antwort ist rechtzeitig und die Qualität sieht gut aus !

—— Martin Ascher

Thanks for the good service, look forward to doing more business in the future.

—— David Green

Ces gens ont répondu rapidement et ont envoyé un bon produit à un bon prix, merci.

—— Gaëtan Grignon

I'm Online Chat Now
Company News

Wiring Harness Assembly Work Instruction

 

Objective: to ensure the uniform operation and stable quality of the wire harness products during assembly. At the same time, the product meets the relevant process and customer requirements, and this operation instruction is specially formulated.

 


Scope: applicable to all wire crimping and assembling operations in the company.

 


Responsibility and right: the production department is responsible for the crimping and assembly of wire rod; the quality control department is responsible for the inspection after assembly.

 


Operation process and requirements:

 


1. During the assembly operation, first confirm whether the material (wire rod, rubber shell) model is used correctly, and whether it is consistent with the corresponding drawings and templates. If it cannot be confirmed, it is necessary to report to the stretcher for confirmation, and formal operation can be carried out only after it is correct.

 


2. When assembling, take the rubber shell with the left hand and a matching terminal line with the right hand. After confirming the normal and insertion direction of the terminal shrapnel, fix the angle and direction of the terminal with the right thumb and index finger, and push the bottom of the acupoint of the rubber shell directly and evenly with light force until the terminal shrapnel hooks the checkpoint in the rubber shell (under normal circumstances, you can hear a click, and feel on the hand) Insert in place. The following picture:

3. During assembly, after inserting a terminal line into the rubber shell, it must be pulled back immediately to see whether the terminal is inserted in place. If the terminal spring catches the clamping point of the rubber shell, it will not come back. Otherwise, during electrical measurement and use, the terminal that is not inserted in place will come back, affecting the use performance of power on and so on. The following picture:

 

4. When assembling, to prevent the terminal from being inserted reversely as a whole, it is necessary to locate the direction of the rubber shell and the sequence of the terminals. As shown in the picture:

5. When multiple single core wires are inserted into the multi hole position, each person can only insert one hole position at a time. According to the requirements of the line sequence in the engineering drawing, the assembly of a multi hole rubber shell shall be completed in turn to prevent the wire from being inserted out of place.

Pub Time : 2019-11-11 09:13:32 >> News list
Contact Details
Zhangjiagang RY Electronic CO.,LTD

Contact Person: Mr. Jerry Sun

Tel: 86-13405295160

Send your inquiry directly to us (0 / 3000)